Apricot: 5 to 10 l/ha. Two applications should be made at 4 and 2 weeks before harvest. Water rate: 500 l/ha minimum. Alternatively, up to 250 ml/100 litres. Two applications should be made at 4 and 2 weeks before harvest. Based on a typical TRV of 2,500 l/ha and a maximum TRV of 4,000 l/ha. Apply sufficient water to provide good cover but avoiding run-off.
Avocado: Apply 250 to 500 mls/100 l water from early fruiting at 7 to 10 day intervals. Based on a maximum TRV of 2,000 l/ha.
Bananas: Four to five applications of 5 l/ha from fruit set at 10-14 day intervals. Water rate: 500 l/ha.
Dry Beans: 5 l/ha applied at the 4-6 leaf stage (10-15 cm tall). Repeat applications can be made at 10-14 day intervals. Water rate: 200 l/ha.
blueberries: 10 l/ha applied 10 days after petal fall has finished. Water rate: 1000 l/ha.
Brassica Crops (Broccoli, Brussel Sprouts, Cabbage, Calabrese, Cauliflower): 2 to 3 applications of 5 l/ha from stem extension/head development to harvest. Allow 10-14 days between applications. Water rate: 75-200 l/ha.
Brassica Crops (Broccoli, Brussel Sprouts, Cabbage, Calabrese, Cauliflower): 2 to 3 applications of up to 5 l/ha from stem extension/head development to harvest. Allow 10-14 days between applications. Water rate: 75-200 l/ha.
Brassica Crops (Broccoli, Brussels Sprouts, Cabbage, Calabrese, Cauliflower): 2 to 3 applications of up to 5 l/ha from stem extension/head development to harvest. Allow 10-14 days between applications. Water rate: 75-200 l/ha.
Brassica Crops (Broccoli, Brussel Sprouts, Cabbage, Calabrese, Cauliflower): 2 to 3 applications of up to 5 l/ha from stem extension/head development to harvest. Allow 10-14 days between applications. Water rate: 75-200 l/ha.
Brassica Crops (Broccoli, Brussel Sprouts, Cabbage, Calabrese, Cauliflower): 2 to 3 applications of up to 5 l/ha from stem extension/head development to harvest. Allow 10-14 days between applications. Water rate: 75-200 l/ha.
Carrots: 2 to 3 applications of up to 5 l/ha at 10 to 15 cm stage or when sufficient leaf area to intercept spray. Allow 10 to 14 day intervals between applications. Water rate: 200 l/ha.
Brassica Crops (Broccoli, Brussel Sprouts, Cabbage, Calabrese, Cauliflower): 2 to 3 applications of up to 5 l/ha from stem extension/head development to harvest. Allow 10-14 days between applications. Water rate: 75-200 l/ha.
Cereals: 5 l/ha. Apply from 4 leaves to second node detectable (Craven 4 - 15). Water rate: 50 - 200 l/ha.
Cherries: 5 to 10 l/ha. Two applications should be made at 4 and 2 weeks before harvest. Water rate: 500 l/ha minimum. Alternatively, up to 250 ml/100 litres. Two applications should be made at 4 and 2 weeks before harvest. Based on a typical TRV of 2,500 l/ha and a maximum TRV of 4,000 l/ha. Apply sufficient water to provide good cover but avoiding run-off.
Cucurbits (field grown): 2 to 3 applications of 5 l/ha commencing at fruit set with 7 day intervals between applications. Water rate: 200 l/ha
Groundnuts/Peanuts: Up to 5 l/ha at start of flowering and again during pod development. Water rate: 50-200 l/ha.
Lettuce (field grown): 2 to 3 applications of up to 5 l/ha commencing 10-14 days after transplanting or emergence, with 10-14 days between applications. Water rate: 50-500 l/ha.
Mango: 3 to 5 applications at a rate of up to 125 mls/100 litres water. Applied from early fruiting to fruit swelling, with 7-10 day intervals between applications. Based on a typical TRV of 2,500 l/ha and a maximum TRV of 4,000 l/ha. Apply sufficient water to provide good cover but avoiding run-off.
Melon (field grown): Up to 5 l/ha. 3 to 5 applications from early fruiting to fruit swelling, with 7-10 day intervals between applications. Water rate: 500-1,000 l/ha.
Nectarines: 5 to 10 l/ha. Two applications should be made at 4 and 2 weeks before harvest. Water rate: 500 l/ha minimum. Alternatively, up to 250 ml/100 litres. Two applications should be made at 4 and 2 weeks before harvest. Based on a typical TRV of 2,500 l/ha and a maximum TRV of 4,000 l/ha. Apply sufficient water to provide good cover but avoiding run-off.
Olive: 5 to 10 l/ha. Regular applications at 10-14 day intervals from petal fall to one week before harvest. Water rate: 500-1000 l/ha.
Peach: 5 to 10 l/ha. Two applications should be made at 4 and 2 weeks before harvest. Water rate: 500 l/ha minimum. Alternatively, up to 250 ml/100 litres. Two applications should be made at 4 and 2 weeks before harvest. Based on a typical TRV of 2,500 l/ha and a maximum TRV of 4,000 l/ha. Apply sufficient water to provide good cover but avoiding run-off.
Pears: 8 to 10 l/ha repeated at 7 to 14 day intervals from end of flowering and timed so that the final application is made one week before harvest. Water rate: 500 l/ha minimum. Alternatively, 250 mls / 100 l repeated at 7 to 14 day intervals from end of flowering and timed so that the final application is made one week before harvest, based on a typical TRV of 2500 l/ha and a maximum TRV of 4000 l/ha.
Persimmons: 5 l/ha after flowering and again 10-14 days later. In addition 10 l/ha applied 6 weeks, 4 weeks and again 2 weeks before harvest. Water rate: 500-1000 l/ha.
Plum: 5 to 10 l/ha. Two applications should be made at 4 and 2 weeks before harvest. Water rate: 500 l/ha minimum. Alternatively, up to 250 ml/100 litres. Two applications should be made at 4 and 2 weeks before harvest. Based on a typical TRV of 2,500 l/ha and a maximum TRV of 4,000 l/ha. Apply sufficient water to provide good cover but avoiding run-off.
Protected Crops: 0.5 litres per 100 litres water maximum concentration. Water rate: 1000 l/ha maximum. Refer to equivalent field grown crop for application timing.
Raspberry: 3 applications of 10 l/ha at start of flowering, end of flowering and fruit development. Water rate: 500 l/ha.
Spinach: 5 l/ha applied from the 4 to 6 leaf stage. Repeat as necessary at 10 to 14 day intervals. Water rate: 200 l/ha.
Water melon (field grown): 2 to 3 applications of 5 l/ha commencing at fruit set with 7 day intervals between applications. Water rate: 200 l/ha
Apricot: 5 to 10 l/ha. Two applications should be made at 4 and 2 weeks before harvest. Water rate: 500 l/ha minimum. Alternatively, up to 250 ml/100 litres. Two applications should be made at 4 and 2 weeks before harvest. Based on a typical TRV of 2,500 l/ha and a maximum TRV of 4,000 l/ha. Apply sufficient water to provide good cover but avoiding run-off.
Avocado: Apply 250 to 500 mls/100 l water from early fruiting at 7 to 10 day intervals. Based on a maximum TRV of 2,000 l/ha.
Bananas: Four to five applications of 5 l/ha from fruit set at 10-14 day intervals. Water rate: 500 l/ha.
Dry Beans: 5 l/ha applied at the 4-6 leaf stage (10-15 cm tall). Repeat applications can be made at 10-14 day intervals. Water rate: 200 l/ha.
blueberries: 10 l/ha applied 10 days after petal fall has finished. Water rate: 1000 l/ha.
Brassica Crops (Broccoli, Brussel Sprouts, Cabbage, Calabrese, Cauliflower): 2 to 3 applications of 5 l/ha from stem extension/head development to harvest. Allow 10-14 days between applications. Water rate: 75-200 l/ha.
Brassica Crops (Broccoli, Brussel Sprouts, Cabbage, Calabrese, Cauliflower): 2 to 3 applications of up to 5 l/ha from stem extension/head development to harvest. Allow 10-14 days between applications. Water rate: 75-200 l/ha.
Brassica Crops (Broccoli, Brussels Sprouts, Cabbage, Calabrese, Cauliflower): 2 to 3 applications of up to 5 l/ha from stem extension/head development to harvest. Allow 10-14 days between applications. Water rate: 75-200 l/ha.
Brassica Crops (Broccoli, Brussel Sprouts, Cabbage, Calabrese, Cauliflower): 2 to 3 applications of up to 5 l/ha from stem extension/head development to harvest. Allow 10-14 days between applications. Water rate: 75-200 l/ha.
Brassica Crops (Broccoli, Brussel Sprouts, Cabbage, Calabrese, Cauliflower): 2 to 3 applications of up to 5 l/ha from stem extension/head development to harvest. Allow 10-14 days between applications. Water rate: 75-200 l/ha.
Carrots: 2 to 3 applications of up to 5 l/ha at 10 to 15 cm stage or when sufficient leaf area to intercept spray. Allow 10 to 14 day intervals between applications. Water rate: 200 l/ha.
Brassica Crops (Broccoli, Brussel Sprouts, Cabbage, Calabrese, Cauliflower): 2 to 3 applications of up to 5 l/ha from stem extension/head development to harvest. Allow 10-14 days between applications. Water rate: 75-200 l/ha.
Cereals: 5 l/ha. Apply from 4 leaves to second node detectable (Craven 4 - 15). Water rate: 50 - 200 l/ha.
Cherries: 5 to 10 l/ha. Two applications should be made at 4 and 2 weeks before harvest. Water rate: 500 l/ha minimum. Alternatively, up to 250 ml/100 litres. Two applications should be made at 4 and 2 weeks before harvest. Based on a typical TRV of 2,500 l/ha and a maximum TRV of 4,000 l/ha. Apply sufficient water to provide good cover but avoiding run-off.
Cucurbits (field grown): 2 to 3 applications of 5 l/ha commencing at fruit set with 7 day intervals between applications. Water rate: 200 l/ha
Groundnuts/Peanuts: Up to 5 l/ha at start of flowering and again during pod development. Water rate: 50-200 l/ha.
Lettuce (field grown): 2 to 3 applications of up to 5 l/ha commencing 10-14 days after transplanting or emergence, with 10-14 days between applications. Water rate: 50-500 l/ha.
Mango: 3 to 5 applications at a rate of up to 125 mls/100 litres water. Applied from early fruiting to fruit swelling, with 7-10 day intervals between applications. Based on a typical TRV of 2,500 l/ha and a maximum TRV of 4,000 l/ha. Apply sufficient water to provide good cover but avoiding run-off.
Melon (field grown): Up to 5 l/ha. 3 to 5 applications from early fruiting to fruit swelling, with 7-10 day intervals between applications. Water rate: 500-1,000 l/ha.
Nectarines: 5 to 10 l/ha. Two applications should be made at 4 and 2 weeks before harvest. Water rate: 500 l/ha minimum. Alternatively, up to 250 ml/100 litres. Two applications should be made at 4 and 2 weeks before harvest. Based on a typical TRV of 2,500 l/ha and a maximum TRV of 4,000 l/ha. Apply sufficient water to provide good cover but avoiding run-off.
Olive: 5 to 10 l/ha. Regular applications at 10-14 day intervals from petal fall to one week before harvest. Water rate: 500-1000 l/ha.
Peach: 5 to 10 l/ha. Two applications should be made at 4 and 2 weeks before harvest. Water rate: 500 l/ha minimum. Alternatively, up to 250 ml/100 litres. Two applications should be made at 4 and 2 weeks before harvest. Based on a typical TRV of 2,500 l/ha and a maximum TRV of 4,000 l/ha. Apply sufficient water to provide good cover but avoiding run-off.
Pears: 8 to 10 l/ha repeated at 7 to 14 day intervals from end of flowering and timed so that the final application is made one week before harvest. Water rate: 500 l/ha minimum. Alternatively, 250 mls / 100 l repeated at 7 to 14 day intervals from end of flowering and timed so that the final application is made one week before harvest, based on a typical TRV of 2500 l/ha and a maximum TRV of 4000 l/ha.
Persimmons: 5 l/ha after flowering and again 10-14 days later. In addition 10 l/ha applied 6 weeks, 4 weeks and again 2 weeks before harvest. Water rate: 500-1000 l/ha.
Plum: 5 to 10 l/ha. Two applications should be made at 4 and 2 weeks before harvest. Water rate: 500 l/ha minimum. Alternatively, up to 250 ml/100 litres. Two applications should be made at 4 and 2 weeks before harvest. Based on a typical TRV of 2,500 l/ha and a maximum TRV of 4,000 l/ha. Apply sufficient water to provide good cover but avoiding run-off.
Protected Crops: 0.5 litres per 100 litres water maximum concentration. Water rate: 1000 l/ha maximum. Refer to equivalent field grown crop for application timing.
Raspberry: 3 applications of 10 l/ha at start of flowering, end of flowering and fruit development. Water rate: 500 l/ha.
Spinach: 5 l/ha applied from the 4 to 6 leaf stage. Repeat as necessary at 10 to 14 day intervals. Water rate: 200 l/ha.
Water melon (field grown): 2 to 3 applications of 5 l/ha commencing at fruit set with 7 day intervals between applications. Water rate: 200 l/ha